l Complete set of precision verification (including high precision zero sequence voltage test, zero sequence current test, electric.
l voltage test, current test).
l The synchronous detection function of three phase voltage transformer and current transformer of primary equipment can be realized simultaneously.
l Detect three-phase voltage, current ratio difference, angle difference, save time.
l Strong load capacity, can provide stable voltage, current, can support on-column switch, ring network.
l Box high current test such as 720 A high current test.
l High stability, can support accurate synthesis of zero-sequence voltage, current, stable voltage and current enable detection.
l Measuring personnel can accurately detect voltage, current accuracy.